Start with the application, not an assumption
These buyer guides help project teams describe the network duty, installation constraints and quotation inputs. They are not a list of completed projects, guaranteed sector approvals or endorsements. The consultant, project engineer and OSTL should agree the exact technical and commercial scope.
Choose your project context
Solar & renewable plants
From an EPC brief to a clearer transformer enquiry—not an assumed solar-specific design.
↗APPLICATION GUIDEHospitals & healthcare
A transformer enquiry should fit the engineer’s continuity and installation plan, not promise uninterrupted care.
↗APPLICATION GUIDEFactories & industrial plants
Load behaviour, interfaces and scope matter as much as the kVA label.
↗APPLICATION GUIDEBuilders & commercial complexes
Coordinate the transformer brief with the building design, consultant and supply requirements.
↗APPLICATION GUIDEColleges, universities & institutions
Consider today’s buildings, future phases and the interfaces between campus systems.
↗APPLICATION GUIDEPower utilities & DISCOMs
A manufacturer’s product range and BIS licence do not establish every utility’s vendor approval.
↗A common range, project-specific selection
OSTL manufactures power and distribution transformers within an overall range of up to 10 MVA and up to 66 kV; the exact rating/voltage combination needs confirmation. Dry-type transformers are a confirmed product line up to 3 MVA. The 66 kV company-range statement must not be applied to dry-type products.
Copper and aluminium winding options are confirmed, with the actual design selected against the project brief. ONAN cooling and CRGO core requirements remain to confirm.
Turn the application into an enquiry
- Required kVA/MVA, HV/LV voltage, phase, frequency and transformer construction.
- Application, load schedule/duty, site conditions, interfaces and relevant single-line diagram.
- Specified losses, impedance, temperature requirements and reference conditions, if defined by the project engineer.
- Quantity, delivery state/country, requested dispatch timeline and boundaries for freight, unloading and installation.
Prepare the quotation brief
Copy or download the blank checklist; mark unknown values for confirmation.
↗RATING INTERESTSBrowse 16 enquiry ratings
63 kVA to 10 MVA across product lines; not a stock or approval catalogue.
↗TENDER BUYERSReview documents and eligibility
Separate BIS licence scope, technical compliance and buyer-specific vendor status.
↗